1. The main materials, equipment and products used in the construction are lack of technical quality identification documents or product certificates that meet the current national or ministerial standards.
2. Do not conduct necessary quality inspection as required before valve installation.
3. The specification and model of the installed valve do not meet the design requirements. For example, the nominal pressure of the valve is less than the system test pressure; when the pipe diameter of the water supply branch pipe is less than or equal to 50 mm, the gate valve is used; the stop valve is used for the dry and vertical pipes of hotwater heating; the butterfly valve is used for the water suction pipe of the fire pump.
4. Wrong valve installation method. For example, the water (steam) flow direction of stop valve or check valve is opposite to the sign, the valve stem is installed downward, the check valve installed horizontally is installed vertically, the handle of rising stem gate valve or butterfly valve has no space for opening and closing, and the valve stem of concealed valve does not face the inspection valve.
5. Ordinary valve flange is used for butterfly valve flange.
6. There are no reserved holes and embedded parts in the construction of the building structure, or the size of the reserved holes is too small and the embedded parts are not marked.
7. During pipe welding, the staggered joint of pipes after butt joint is not on a central line, no gap is left for butt joint, no groove is cut for thick wall pipes, and the width and height of weld do not meet the requirements of construction specifications.
8. The pipeline is directly buried in frozen soil and untreated loose soil, and the spacing and position of pipeline buttresses are improper, even in the form of dry bricks.
9. The material of the expansion bolt for fixing the pipe support is poor, the hole diameter for installing the expansion bolt is too large or the expansion bolt is installed on the brick wall or even the light wall.
10. The strength of flange plate and gasket for pipeline connection is not enough, and the connecting bolt is short or the diameter is thin. Rubber pad is used for heat pipe, asbestos pad is used for cold water pipe, double-layer pad or bevel pad is used, and flange pad protrudes into the pipe.
11. During the hydrostatic strength test and tightness test of the pipeline system, only the pressure value and water level change are observed, and the leakage inspection is not enough.
12. Sewage, rainwater and condensate pipes shall be concealed without closed water test.
13. The pipeline system is not washed carefully before completion, and the flow and speed cannot meet the requirements of pipeline flushing. It even uses the hydraulic strength test to drain water instead of flushing.
14. Carry out water pressure test under negative temperature during winter construction.